2021 KHS Girls Dormitory

KHS Girls Dorm Progress 2021W38

Having prepared all form work of 4 bedrooms and 1 bathroom, here the builders are preparing the roof for concrete casting which is now few days. The red-clay bricks are what is called here ‘maxpans’. They make the hanging floor kind of hollow with air pockets inside, thereby reducing the total weight of the floors yet keep it structurally strong.

The man in brown shirt and white boots is our site-engineer Kissa Fredrick.